NXE · Transformation

Watch a terminal evolve.

A container terminal today runs seven separate energy interactions with the outside world. Diesel equipment. Diesel lorries. Vessels running their own generators. A grid connection for lighting. In seven stages, each with its own driver, that terminal becomes an active participant in the energy system. Scroll to see them appear, one at a time.

Scroll to begin ↓
Terminal state 1: traditional operation Terminal state 2: solar on the roof Terminal state 3: yard electrified Terminal state 4: trucks plug in Terminal state 5: barge on shore power Terminal state 6: vessel on shore power Terminal state 7: integrated bidirectional system
Stage 01

A terminal as it works today.

Diesel equipment in the yard. Diesel trucks at the gate. A vessel at berth running its auxiliary engines for hotel load. An inland barge alongside, fuelled by fossil fuel. A grid connection that powers lighting, cranes and office. Nothing more.

Baseline
The traditional terminal sits inside a quiet but steady cost: emissions, fuel volatility, regulatory exposure that has not yet bound, but is on its way.
Stage 02

Sunlight on the roof.

Solar PV on the warehouse covers part of the terminal's electricity demand. Corporate emissions on scope 2 fall. The electricity bill becomes less exposed to wholesale spot prices. Renewable electricity certificates can be traded, or kept on the balance sheet to reduce reporting exposure under CSRD.

Driver
CSRD scope 2 disclosure · GOO certificate value · electricity price hedge
Stage 03

The yard goes electric.

Terminal equipment moves from diesel to zero-emission powertrains. The charging infrastructure becomes part of the site's energy architecture. Scope 1 emissions drop. Per-move OPEX shifts from a fluctuating diesel price to a controlled electricity contract.

Driver
Scope 1 corporate targets · ZE materieel mandates · OPEX stabilisation
Stage 04

Trucks plug in at the gate.

Electric charging at the gate enables zero-emission trucks to plug in while loading and unloading. AFIR mandates the infrastructure deployment. Carbon credits accrue on each charged kWh and can be steered towards the vessels or the trucks, depending on where the value sits highest. The terminal becomes commercially attractive to ZE-truck fleets. A competitive position, not just a compliance cost.

Driver
AFIR Art. 4 deployment · HBE/road credits · ZE-fleet commercial preference
Stage 05

The inland barge plugs in.

Shore power for inland barges at berth replaces the auxiliary diesel they run for hotel load. The energy supplied flows back financially through certificates, securing commercial advantage for both the terminal and the visiting vessels. Air quality at the quay improves. The barge operator can demonstrate compliance against the tightening inland-shipping carbon framework.

Driver
BRE binnenvaart · RED III certified electricity · local air-quality compliance
Stage 06

The vessel at berth plugs in.

Shore power for sea-going vessels at berth removes the most visible point source on the quay: the auxiliary engines running while the vessel is alongside. FuelEU Maritime creates the commercial advantage; AFIR mandates the infrastructure. The combined value of penalty avoidance and pooling credit makes the case sustain.

Driver
FuelEU Maritime at-berth · AFIR Art. 9 shore-side electricity · pooling credit value
Stage 07

Every asset works both ways.

PV produces. The battery stores. The chargers absorb or curtail. The vessels at berth become controllable loads. The grid connection becomes bidirectional. Importing when economic, exporting when ancillary services pay. Under the congestion management code, flexible capacity now carries explicit value. Certificate strategy across FuelEU pooling, carbon credits and GOO captures the value most operators leave on the table. The terminal is no longer a passive electricity buyer. It is an active node in the energy system.

Integrated system
ACM congestiemanagement · FuelEU pooling · cross-scheme certificate optimisation · grid services revenue
08

Where Nexus Energy comes in

Most operators are at stage two, planning stage three.

Nexus Energy helps see stage seven, and what it takes to sequence the path there without locking in the wrong technology or leaving certificate value on the table. Every stage in the transformation is a real decision in a real boardroom. The hard part is not knowing the destination. It is sequencing the path.

The first conversation is exploratory. No prepared deck required. Bring the question you are sitting on. We respond with what we would measure first, and what the answer would have to show before we commit to it.

Request a first conversation See the cases