A method is not a slogan. It is a sequence of steps that hold under scrutiny, from the first onboard measurement to a system that runs in service. The four pillars, the five steps, and the deliverables that come out of each stage.
Every study Nexus Energy runs exercises all four. When any one is missing, the answer breaks somewhere later.
Onboard energy conversion, storage, generation and integration at subsystem level. Terminal-side infrastructure. Technology-agnostic across carriers and conversion routes: compressed hydrogen LTPEM fuel cells, direct methanol LTPEM fuel cells, batteries, and on-board ammonia cracking with H2 ICE in a combined modular skid.
AFIR, FuelEU Maritime, EU ETS, IMO Net-Zero Framework, RED III, CSRD and national schemes. What binds when. What is optional. Where the certificate value sits. National schemes matter as much as European ones: BRE, HBE, and the Dutch grid-code have direct commercial consequences.
A plan that is executable technically, economically and financially. Not only at day one, but at the far end of a twenty-year investment horizon in which revenue models, technology maturity and certificate markets will all shift. Sensitivities and scenarios sit inside the case, not behind it. The negative case is always modelled alongside the positive one.
Hands-on at the micro level: what actually happens on board, in the machine room, at the switchboard, on the quay. Duty cycles under real load. Integration behaviour under commissioning. Component interaction across a live control system. The detail that determines whether a design survives its first year in service, and that no datasheet ever captures.
Whether the asset is an inland dredger, a crew transfer vessel or a full container terminal. The technology under evaluation changes. The method does not.
Real operational data first. Not datasheets, not typical values, not simulated profiles. Onboard measurement equipment where nothing suitable is installed. Existing telemetry where it is. What the asset actually does, on the trade it actually runs.
For a vessel: where it trades, what fuels and charging are available along that trade, what binds on those routes. For a terminal: the grid connection headroom, the site plan around it, the loads competing for the same capacity, the certificate schemes that apply. Externally-dictated constraints that any solution must live inside.
Energy architecture built on measured behaviour and real constraints. Options laid out with their trade-offs. Certificate strategy positioned across the schemes that apply. A digital shadow of the asset when the study calls for it.
FEED conclusion, defensible. Go, no-go, or refined scope. When a phased investment path is on the table, it is substantiated against sensitivities: fuel prices, certificate value, technology maturity, regulatory shifts. The client walks away with a decision they can defend to a board, to a financier, and, later, to an auditor.
When the case sustains, EPIC follows. System architecture, detail engineering, procurement, class engagement, installation, commissioning, monitoring. Nexus Energy stays in place across the transition from FEED to installed system.
Advising liquid hydrogen to a vessel whose trade has no liquid hydrogen supply is not advice. It is wasted FEED time. The check happens at step 02, not at handover. If step 03 shows the case does not hold, step 04 is a documented no-go, not a rewritten yes.
The physical products of the method. Named, dated, versioned, coded. This is how Nexus Energy documents its work.
A single defensible document that captures the measurement, the operational context, the architecture, and the trade-offs. Ready to hand to a board, a financier, or a class society.
| Section | Content |
|---|---|
| 01 Measurement | Onboard data, duty cycles, source resolution |
| 02 Context | Trade, port infrastructure, regulatory envelope |
| 03 Architecture | Options, sizing, integration boundary |
| 04 Techno-economics | Case, sensitivities, certificate strategy |
| 05 Recommendation | Go, no-go, or refined scope |
Physical delivery when the FEED sustains. System architecture through to commissioning and monitoring. Modular where the design permits, integrated where the vessel demands it.
| Stage | Product |
|---|---|
| 01 System | Architecture and detail engineering |
| 02 Procurement | Modular where feasible |
| 03 Class | Documentation, review, approval |
| 04 Install | Integration, wiring, commissioning |
| 05 Operate | Training, monitoring, performance baselining |
The method makes more sense when you see it applied.
Operational deployments alongside a portfolio of FEED studies. All followed the same five steps. Vessel type differs. Decision context differs. Technology under evaluation differs. Method is constant.